Translations: Groupe scolaire/2/en

Aus Smart Places Network
Wechseln zu: Navigation, Suche

Standort Frankreich 38210 La Riviere Koordinaten 45° 14' 5", 5° 30' 26"


Group scholaire-1.jpg


Group scholaire-2.jpg


Group scholaire-3.jpg


Principal Commune de la Rivière
Address Pontonnière, 38210 La Riviere
Energy planning
year fo finalisation 2013
Construction costs € brutto 1 233 660 €
Base area[m²]
Useful area[m²]
Cubage [m³]
Heating demand [kWh/(m²BGFa]
Heatingsystem
Technical data other object types
Project description The bearing shell of the building is formed by a prefabricated pinewood and sprice frame with à cellulose wadding filling dressed with an unvarnished varia-ble thickness and length Douglas weatherboarding. The design revolves around the bioclimatc approach: south exposure, high com-pactness, natural light, natural ventilation openings and a high interior inertia.
Construction material timber
Planning A close collaboration between the municipality, sawyers, carpenters and other stakeholders involved was the key to accomplish this unique project.
Construction processing Inquiry, offer, contract, accounting Architect: Rigassi & Associés Architectes - RA2 Wood consulting: Gaujard technologie Sawyer: Scierie Blanc Wood manufacturer: SDCC
Information on regionality Bois des Alpes
Further information http://boisdesalpes.net/realisation-batiment.php?bid=13