College Marcelle: Unterschied zwischen den Versionen

Aus Smart Places Network
Wechseln zu: Navigation, Suche
 
(2 dazwischenliegende Versionen desselben Benutzers werden nicht angezeigt)
Zeile 1: Zeile 1:
 +
<translate>
 +
 +
<!--T:1-->
 
{{Gallerie Element
 
{{Gallerie Element
 
|Bild=College-1.jpg
 
|Bild=College-1.jpg
Zeile 8: Zeile 11:
 
|Bild=College-3.jpg
 
|Bild=College-3.jpg
 
}}
 
}}
{{Best practice objekte
+
{{Best practice examples englisch
 
|Bauherr=Ville de Beaumont les Valence
 
|Bauherr=Ville de Beaumont les Valence
 
|Adresse=41 rue des Faures 26760 Beaumont Lès Valence
 
|Adresse=41 rue des Faures 26760 Beaumont Lès Valence
Zeile 22: Zeile 25:
 
|Weitere Informationen=https://www.bernaud.fr/project/college-de-beaumont-les-valence/ https://www.ledauphine.com/drome/2017/05/13/c-est-le-college-du-xxie-siecle http://www.caue-observatoire.fr/ouvrage/college-marcelle-rivier/
 
|Weitere Informationen=https://www.bernaud.fr/project/college-de-beaumont-les-valence/ https://www.ledauphine.com/drome/2017/05/13/c-est-le-college-du-xxie-siecle http://www.caue-observatoire.fr/ouvrage/college-marcelle-rivier/
 
}}
 
}}
<!--T:1-->
 
  
  
Zeile 30: Zeile 32:
 
|Kategorie= Best practice examples
 
|Kategorie= Best practice examples
 
}}
 
}}
 +
</translate>

Aktuelle Version vom 19. Dezember 2020, 12:48 Uhr


College-1.jpg


College-2.jpg


College-3.jpg


Principal Ville de Beaumont les Valence
Address 41 rue des Faures 26760 Beaumont Lès Valence
Energy planning
year fo finalisation 2017
Construction costs € brutto 21 million €
Base area[m²] 4.413
Useful area[m²]
Cubage [m³]
Heating demand [kWh/(m²BGFa]
Heatingsystem 730 m² PV panels, positive energy building
Technical data other object types A Canadian well system was installed under the courtyard that feeds in the ventilation classroom ventilation through a Fan Assisted Natural Ventilation. • Bioclimatic architecture: direction of the building in reference to the wind currents and the sun. • Wall linings with 280mm wood fiber insulation • Reinforced airtightness • All carpentry products are treated with the NABACO process (an environ-mentally friendly process that guarantees the durability of wood.
Project description A passive school in Beaumont-Lès-Valence is conformed of 4 buildings around a central courtyard, each building with a specific purpose: class rooms to the north, administrative building to the east, common areas (lunch area and multipurpose hall) to the south and the east respectively and above the multipurpose hall, 3 staff accommodation duplex.
Construction material timber 900 m³ spruce and Douglas
Planning
Construction processing Inquiry, offer, contract, accounting Project owner: département de la DROME Maître d’œuvre : CHABAL Architectes, Architectes à Grenoble
Information on regionality Certified Bois des Alpes TM
Further information https://www.bernaud.fr/project/college-de-beaumont-les-valence/ https://www.ledauphine.com/drome/2017/05/13/c-est-le-college-du-xxie-siecle http://www.caue-observatoire.fr/ouvrage/college-marcelle-rivier/



Standort Frankreich 26760 Beaumont Lès Valence Koordinaten 44° 51' 39", 4° 56' 29"