Pont routier/en: Unterschied zwischen den Versionen

Aus Smart Places Network
Wechseln zu: Navigation, Suche
 
Zeile 1: Zeile 1:
 +
{{Standort
 +
|Standort= Frankreich 73160 Cognin
 +
|Kategorie=Best practice examples
 +
}}
 
{{Gallerie Element
 
{{Gallerie Element
 
|Bild=Pont routier-1.jpg
 
|Bild=Pont routier-1.jpg
Zeile 16: Zeile 20:
 
|Projektbeschreibung=480 m³ of Bois des Alpes Douglass timber were used to make 9 (40m by 1m by 54cm) laminated timber beams laid across the Hyères River completed with a concrete deck adapted for public transportation and soft mobility. This bridge will be the main entrance to the new Cognin’s Eco-suburb and a great statement to show their commitment to the use of low carbon, local ressources.
 
|Projektbeschreibung=480 m³ of Bois des Alpes Douglass timber were used to make 9 (40m by 1m by 54cm) laminated timber beams laid across the Hyères River completed with a concrete deck adapted for public transportation and soft mobility. This bridge will be the main entrance to the new Cognin’s Eco-suburb and a great statement to show their commitment to the use of low carbon, local ressources.
 
|Informationen zur Regionalität=Douglass fir, origin from La Biolle (73) and St Martin d’Uriage (38
 
|Informationen zur Regionalität=Douglass fir, origin from La Biolle (73) and St Martin d’Uriage (38
}}
 
{{Standort
 
|Standort= Frankreich 73160 Cognin
 
|Kategorie= Best practice examples
 
 
}}
 
}}

Aktuelle Version vom 19. Dezember 2020, 12:55 Uhr

Standort Frankreich 73160 Cognin Koordinaten 45° 33' 37", 5° 53' 30"


Pont routier-1.jpg


Pont routier-2.jpg


Pont routier-3.jpg


Principal Ville de Cognin et Chambéry Métropole
Address Cognin, bridge over the Hyères river
Energy planning
year fo finalisation 2013
Construction costs € brutto 1 million €
Base area[m²]
Useful area[m²]
Cubage [m³]
Heating demand [kWh/(m²BGFa]
Heatingsystem n.A.
Technical data other object types
Project description 480 m³ of Bois des Alpes Douglass timber were used to make 9 (40m by 1m by 54cm) laminated timber beams laid across the Hyères River completed with a concrete deck adapted for public transportation and soft mobility. This bridge will be the main entrance to the new Cognin’s Eco-suburb and a great statement to show their commitment to the use of low carbon, local ressources.
Construction material timber
Planning
Construction processing
Information on regionality Douglass fir, origin from La Biolle (73) and St Martin d’Uriage (38
Further information