College Marcelle
Aus Smart Places Network
Version vom 7. April 2020, 13:21 Uhr von Strohmeier (Diskussion | Beiträge) (Diese Seite wurde zum Übersetzen freigegeben)
Bauherr | Ville de Beaumont les Valence | |
---|---|---|
Adresse | 41 rue des Faures 26760 Beaumont Lès Valence | |
EnergiePlanung | ||
Jahr der Fertigstellung | 2017 | |
Baukosten € brutto | 21 million € | |
Grundfläche [m²] | 4.413 | |
Nutzfläche [m²] | ||
Kubatur [m³] | ||
Heizwärmebedarf [kWh/(m²BGFa] | ||
Heizungsart | 730 m² PV panels, positive energy building | |
Technische Daten andere Objekte | A Canadian well system was installed under the courtyard that feeds in the ventilation classroom ventilation through a Fan Assisted Natural Ventilation. • Bioclimatic architecture: direction of the building in reference to the wind currents and the sun. • Wall linings with 280mm wood fiber insulation • Reinforced airtightness • All carpentry products are treated with the NABACO process (an environ-mentally friendly process that guarantees the durability of wood. | |
Projektbeschreibung | A passive school in Beaumont-Lès-Valence is conformed of 4 buildings around a central courtyard, each building with a specific purpose: class rooms to the north, administrative building to the east, common areas (lunch area and multipurpose hall) to the south and the east respectively and above the multipurpose hall, 3 staff accommodation duplex. | |
Baustoff Holz | 900 m³ spruce and Douglas | |
Planungsprozess | ||
Bauabwicklung | Inquiry, offer, contract, accounting Project owner: département de la DROME Maître d’œuvre : CHABAL Architectes, Architectes à Grenoble | |
Informationen zur Regionalität | Certified Bois des Alpes TM | |
Weitere Informationen | https://www.bernaud.fr/project/college-de-beaumont-les-valence/ https://www.ledauphine.com/drome/2017/05/13/c-est-le-college-du-xxie-siecle http://www.caue-observatoire.fr/ouvrage/college-marcelle-rivier/ |