Groupe scolaire
Aus Smart Places Network
Version vom 19. Dezember 2020, 12:46 Uhr von Strohmeier (Diskussion | Beiträge)
| Principal | Commune de la Rivière | |
|---|---|---|
| Address | Pontonnière, 38210 La Riviere | |
| Energy planning | ||
| year fo finalisation | 2013 | |
| Construction costs € brutto | 1 233 660 € | |
| Base area[m²] | ||
| Useful area[m²] | ||
| Cubage [m³] | ||
| Heating demand [kWh/(m²BGFa] | ||
| Heatingsystem | ||
| Technical data other object types | ||
| Project description | The bearing shell of the building is formed by a prefabricated pinewood and sprice frame with à cellulose wadding filling dressed with an unvarnished varia-ble thickness and length Douglas weatherboarding. The design revolves around the bioclimatc approach: south exposure, high com-pactness, natural light, natural ventilation openings and a high interior inertia. | |
| Construction material timber | ||
| Planning | A close collaboration between the municipality, sawyers, carpenters and other stakeholders involved was the key to accomplish this unique project. | |
| Construction processing | Inquiry, offer, contract, accounting Architect: Rigassi & Associés Architectes - RA2 Wood consulting: Gaujard technologie Sawyer: Scierie Blanc Wood manufacturer: SDCC | |
| Information on regionality | Bois des Alpes | |
| Further information | http://boisdesalpes.net/realisation-batiment.php?bid=13 | |